Chorleywood, 2018-2019

A new project for a new building consultant client in Hertfordshire. A double extension and internal refit.

Weather protection is a difficult financial decision for any client, but as the weather turns through the Autumn into Winter, the benefits in productivity are clear.

Scaffolding done the right way.

Needles bracing the scaffold to the existing wall.

Removal of gable roof

The rip out continues

 

Work getting started, roof removal, tin hat and foundation excavation

Digging out

Building over new 4″ drains

Foundations ready for block and beam floor

Block and beam floor installed over foundations.

Mixer doing its job.

Wall ties and steel supporting new first floor extension.

Steels and padstones.

Leveling extension blockwork.

Leveling extension blockwork

Tile detail to match existing

Roofing Timbers

First floor almost dry